Not yet measured
This game is in the catalog, but no published review benchmarks have been collected for it yet — so this page carries no frame-rate numbers, no verdicts and no estimates. Below are the publisher's own system requirements and what they say about the hardware the game targets. A game joins the calculator only when published review benchmarks cover both its CPU and GPU sides.
Developer: Beat Games · Released: May 21, 2019 · Genres: Indie
Game facts and system requirements are as published on Steam (checked 4 November 2026).
On Steam: the store page — the publisher's listing, with trailers and screenshots. (Steam has no affiliate program; this link earns us nothing.)
As published by the publisher on Steam (checked 4 November 2026). Requirements are the publisher's target figures, not measurements — they describe the hardware the developer aims at, not the frame rate any part delivers.
| Component | Minimum (Steam) | Recommended (Steam) |
|---|---|---|
| OS | Windows 10/11 (64bit) | Windows 10/11 (64bit) |
| Processor | Intel Core i5 Sandy Bridge or equivalent | Intel Core i7 Skylake or equivalent |
| Memory | 4 GB RAM | 8 GB RAM |
| Graphics | Nvidia GTX 960 or equivalent | Nvidia GTX 1060 or equivalent |
| DirectX | Version 11 | Version 12 |
| Storage | 200 MB available space | 200 MB available space |
| VR Support | SteamVR | — |
Moderate — estimated from the graphics card named in the recommended requirements above (GTX 1060). The demand level classifies the publisher's published requirements only; it is not a benchmark result and predicts no frame rate.
Not yet measured. Bottleneck Verdict adds a game to the calculator when published review benchmarks cover both sides at the game's highest settings, native resolution, no upscaling — the same bar the measured games met. Until then this page claims no performance figures for Beat Saber.
Games that are measured today: browse the catalog — measured games are listed first, each with its measured CPU ceilings and GPU results by resolution, plus clearly labelled estimates for parts that were not measured.